We have been working particularly hard the last three weeks renovation our bathroom. The first job for me was to clean the antique mirror that we bought at the brocante in Daglan a few weeks ago. After various checks on the internet it was found that washing up liquid in a bucket of water was the best idea for cleaning old gilt, so armed with a soft toothbrush I set to work one sunny afternoon.

renovationTwo hours later I had completed the back of the mirror the difficult intricate detail on the front of the mirror was yet to come. After informing Paul that dinner would be a little late this evening I set to work once more.

Another three hours work and the mirror was finished.

 

DSCN1418The original mirror from the bathroom was taken down and placed onto our son’s bedroom wall. A wooden frame was built and varnished to match the wooden bed on the right hand side of the picture.
 

DSCN1419Unfortunately Paul realised that the partition walls upstairs were thinner than the length of the drill, he had drilled through to the next bedroom. This is one hole there are three others. Never mind, its just another job on our to do list.
 

We were only going to re-tile one wall but after completing the one wall with new the tiles, the old tiles looked even more terrible so another two walls needed work, another trip to Sarlat this time for more tiles. Paul took off the old tiles and you guessed it, the plaster came off too. Back to the DIY store for plaster which took four days to dry.

DSCN1421Here is half of one of the walls with the new tiles the other half of the wall took longer to tile due to the undulating nature of our walls.
 

Next came the wall at the back of the shower and toilet so Paul protected the shower and toilet with plywood and cardboard. One tile fell off, hit the cardboard corner first, cut it and the plywood like a knife through butter and the result can be seen in this picture.

DSCN1422I am glad to say that a new toilet was bought on the next visit to the DIY store and is now in place.
 

DSCN1432Finished with no further problems and looking great. The wash hand stand was purchased from a brocante shop in Daglan that Paul renovated. It has a gorgeous marble top that cleaned better than we expected and is in keeping with the period of the house.
 
 

Events:- Not to be missed- Daglan Art’Ceou Exposition which runs from the 19th June to the 3rd July

Also, Fête de la Musique – 21st June in Sarlat throughout the Medieval town, for jazz, blues and rock music.

Advertisements

7 thoughts on “The ups and downs of renovation

  1. Just found your blog through Blog-sur-Aude. Gorgeous mirror, and so worth all your gentle cleaning. How did you cut through the marble top for the sink?

    • Thank you for the comment, here is Paul to explain how he cut through the marble.

      Hi Ellen. I was very worried about cutting the marble but it was really quite easy. I bought a set of diamond hole cutters from Amazon. Placed the marble on a firm, flat surface. Built a little well of putty around where I wanted the holes and poured in a little water. The hole cutters made the job a doddle.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s